Image Added
In words
Availability = total plant time minus total downtime this divided by total plant time multiplied by 100.
In numbers
Example:
Image ModifiedInfluence of planned downtime on availability
Factors that lead to planned downtimes are not applied in the calculation of technical availability (e.g. maintenance intervals). These are usually exactly regulated by contract. As a rule, these times do not lead to a reduction in the availability period (see picture).