🚦03 Realtime status of plants
Prerequisites
For this function to work properly, your logger must have sent minute data at least once (You can check for incoming data in the Portal via “Administration” → “Plants” → Choose a plant → “Raw data Tasks” → Task Type: PutMin).
- 1.1 Prerequisites
- 2 Communication Monitoring
- 2.1 Color Legend
- 2.1.1 Version 4.8.0
- 2.1.1.1 red
- 2.1.2 to Version 4.7.7
- 2.1.1 Version 4.8.0
- 2.2 Display Power Management Regulation
- 2.1 Color Legend
Communication Monitoring
The displayed color codes are based on the most recently transmitted data packet.
Color Legend
Version 4.8.0
In Version 4.8.0, we improve the overview by reducing color complexity.
In summary, this means:
From now on, we will use the colors gray, green, and red. The colors orange and yellow have been removed.
In the case of communication errors, the percentage distinction of faulty components is eliminated. Thus, the status of your system changes to red as soon as one communication error occurs.
Deviations and status errors currently have no impact on the real-time status of a plant.
red | Reason 1: Monitoring Not PossiblePlant data cannot be processed or is missing - e.g., due to an error in the Solar-Log™. This includes:
Reason 2: Monitoring Reports Faulty Plant ConditionAfter evaluating the transmitted data, a problem with the plant is detected. This includes:
|
green | All plant data for monitoring is available. Communication with the Solar-Log™ and the connected components is functioning. Please note that deviations and component status alarms may still be present. |
grey | Reason: New plant created, no data transfer yet
|
to Version 4.7.7
Deviations and status errors currently have no impact on the real-time status of a plant.
red |
OR
OR
OR
|
|---|---|
orange |
|
yellow |
|
green |
AND
Check the incoming data in plant administration and the monitoring. |
grey | Plants that have not yet transmitted any data. |
Display Power Management Regulation
If a plant is limited regarding its maximum active power, this will be indicated with a blue lightning.
Limitations of the plant can be tracked via Data Studio → Power Management.
To ensure the detection of the power management regulation works correctly, please ensure that the reference power of the plant matches the installed AC power.