Version 4.5.4

Released: 26.04.2022


Performance Ratio Heatmap

You can now view the Performance Ratio (AC) in the analysis.

For the calculation to be performed, the following conditions must be met:

  • The installation date must be set.

  • The generator power of the MPP trackers is set.

  • Module fields are configured.

  • The plant location is resolved (the pin on the map is visible).

Bug fixed 🐛 & Improvements🚀

  • In case of deviations, the specific target yield was not displayed. This has been fixed.

  • The quick access widget had a problem on the alarm detail page where the button for analysis did not work. This is now working again.

  • The global search now also lists the user search portal.